ENLanguage
Discuss an opportunityContact

Renewable energy projects in Romania, from sourcing to operation.

ANRE certifications

ANRE (Romanian Energy Regulatory Authority)

  • E1Design
  • E2Execution
  • A3Testing
Projects

EPC contractor for two solar plants in Alba County

The 79 MWp site in Alba County in October 2026: piling rigs driving the first mounting posts into a dry field, with rows of posts and steel profiles laid out beside them
Site layoutLayout of the 79 MWp plant: blocks of panel rows on a triangular plot, with internal roads, inverter stations and a green buffer along the fence
Current project79 MWp
Location
Alba County
Our role
EPC contractor
Works started
1 October 2026
How we deliver a project
Aerial views of the same site: a grass field crossed by vehicle tracks on 25 April 2026, and the completed solar plant on 5 September 2026
Completed project13.3 MWp
Location
Lunca Mureșului, Alba County
Our role
EPC contractor
Works started
1 May 2026
Completed
5 September 2026
What we do

One partner from company set-up to the operating plant.

  1. Market entry and company set-up

  2. Project sourcing and development

  3. EPC: engineering, procurement, construction

  4. Operations and maintenance

  5. Energy trading (starting soon)

  6. Market intelligence

Why Momentum Energy

A company that finds, builds and operates, not only advises.

About Momentum Energy
  • 35years in Romania

  • E1 · E2 · A3ANRE certifications

  • 30+solar plants built by our technical team

  • 1partner, from sourcing to operation

Why Romania

An EU market that is being built right now, in euros.

Blog

Analysis written for people deploying capital, not for headlines.

Discuss an investment opportunity in Romania